2″ Mill & Pave over 400,000 SF, 8 drain re-builds, 1,400 SF Concrete Walkway Installation – removed existing landscaping to replace the with concrete for easier maintenance, more than 15 miles of line striping

Crack sealing & line striping keeps this busy distribution center in tip top condition.
Nearly 400,000 SF Mill & Pave over 4 different parking lots at three different warehouses
This 35,000 SF pavement restoration covered 3 different sections of parking lot throughout the mall